Boats of
St-Malo
Version française   English version
flux RSS
© 1999-2016
Alain Déchorgnat


FBC-120x60

photo report Return from campaign of
Grande Hermine

Sunday April 30, 2001

Grande Hermine

Back Campaign, the Grande Hermine enters the channel. The harbour pilot has joined the board at landing buoy off the coast of the island of Cézembre.


The Grande Hermine underway to the entrance to the port.



On leaving the lock, the Grande Hermine enters basin Vauban and crosses it to join Duguay-Trouin basin through perthuis of Saint Malo.


Arrived in the 2nd basin, the Grande Hermine comes moored dockside Duguay-Trouin in front of refrigerated warehouses of the Comapêche where frozen fish will be discharged.