Back Campaign, the Grande Hermine enters the channel. The harbour pilot has joined the board at landing buoy off the coast of the island of Cézembre.
The Grande Hermine underway to the entrance to the port.
On leaving the lock, the Grande Hermine enters basin Vauban and crosses it to join Duguay-Trouin basin through perthuis of Saint Malo.